Two coats of aluminium paint, with a primer of zinc chromate before that, was applied on the bridge, requiring a total of 26,500 litres of paint. The complete model can be printed with very low infills. by TEC-BOT - ming mcgoldr... 21 78 5. The committee eventually decided on a floating bridge. In 1939 when construction was once again due to begin on what was now called the New Howrah Bridge, war broke out again and all steel which had been intended for use on the bridge was rediverted to help the British war effort. In 2004, KoPT spent ₹6.5 million (US$91,000) to paint the entirety of 2.2 million square metres (24 million square feet) of the bridge. 16 hydraulic jacks, each of which had an 800-ton capacity, were pressed into service to join the two halves of the suspended span. The assembling period was fraught with problems. One night during the process of grabbing the muck out, the ground shifted and the construction mass dropped around 6m registering as an earthquake on the seismograph and destroying a local Hindu temple which then had to be rebuilt. Shortly thereafter, his dead body is found under Calcutta's Howrah Bridge. From 31 May 2007 onwards, overloaded trucks were banned from crossing the bridge and were redirected to the Vidyasagar Setu instead. It was renamed as Rabindra Setu on June 14, 1965, after the name of Nobel Laureate Rabindranath Tagore. [21] While muck was being cleared, numerous varieties of objects were brought up, including anchors, grappling irons, cannons, cannonballs, brass vessels, and coins dating back to the East India Company. This 3D CAD model was created by CAD FM, a social enterprise based in Glasgow, and is available for 3D printing free of charge for educational purposes. SOLIDWORKS 2016, STEP / IGES, Rendering, October 10th, 2017 Stahl-Brück/Bridge. $32. The bridge is an icon of Kolkata and links the city of Howrah to Kolkata. bridge, built on the holiest of holy rivers, the Ganga, has a quasi-mystical significance for him. Nearly 350 metres (1,150 ft) of 700 metres (2,300 ft) of the track were twisted beyond repair. [32] For the repair, which cost around ₹5 million (US$70,000), about 8 tonnes of steel was used. He had recently established the company's rail terminus in Howrah. The bridge deck measures 71ft in width and features two … There are two main expansion joints, one at each interface between the suspended span and the cantilever arms and there are others at the towers and at the interface of the steel and concrete structures at both approach. In 1921 a committee of engineers named the 'Mukherjee Committee' was formed, headed by R. N. Mukherji, Sir Clement Hindley, chairman of Calcutta Port Trust and J. McGlashan, Chief Engineer. [4], The Kolkata Port Trust (KoPT) is vested with the maintenance of the bridge. [29], On 24 June 2005, a private cargo vessel M V Mani, belonging to the Ganges Water Transport Pvt. The bridge has two end anchor spans (which are anchored at the end supports) and one main span consisting of two cantilevers and one suspended span. The bridge contains no nuts and bolts and was put together entirely by riveting. Multi-dredge hole wells or monoliths are adopted in supporting piers or towers of long span bridges. The bridge is one of four on the Hooghly River and is a famous symbol of Kolkata and West Bengal. [7] The bridge was complete in 1874,[8] at a total cost of ₹ 2.2  million,[16] and opened to traffic on 17 October of that year. The impact of this was so intense that the seismograph at Kidderpore registered it as an earthquake and a Hindu temple on the shore was destroyed, although it was subsequently rebuilt. It extended tenders to 23 firms for its design and construction. [20] The caisson at Kolkata side was set at 31.41 m and that at Howrah side at 26.53 m below ground level.[4]. Jul 21, 2016 - This Pin was discovered by Ramyani. Here you can change your privacy preferences. 4 Rogart Street, Suit 3/17 G40 2AA, Glasgow, United Kingdom. After that I have travelled on this bridge so many times. Technically, Howrah Bridge is a Suspension type Balanced Cantilever Bridge, with a central span 457.2 m between centers of main towers and a suspended span of 171.9 m. The main towers are 85.344 m high above the monoliths and 23.2 m apart at the top. This is a 3D scaled-down model of the Howrah Bridge which spans the Hooghly River, a distributary of the Ganges River that flows through West Bengal, India. The two anchorage caissons were each 16.4 m by 8.2 m, with two wells 4.9 m square. The model is a single piece, it can be scaled and sliced to create a larger version. [10] It is still popularly known as the Howrah Bridge. Large ferry steamers capable of carrying vehicular load (set up cost, This page was last edited on 5 January 2021, at 00:24. All the materials are … (AutoCAD 2000.dwg format) Our 3D CAD drawings are purged to keep the files clean of any unwanted layers. The roadway on the new bridge would be wide enough to take at least two lines of vehicular traffic and one line of trams in each direction and two roadways each 30 feet wide, giving a total width of 60 feet of road way which are quite sufficient for this purpose [...] The traffic across the existing floating bridge Calcutta & Howrah is very heavy and it is obvious if the new bridge is to be on the same site as the existing bridge, then unless a temporary bridge is provided, there will be serious interruptions to the traffic while existing bridge is being moved to one side to allow the new bridge to be erected on the same site as the present bridge. Ghats of Varanasi Drawing. The need for a bridge connecting the cities on either side of the Ganges was felt early on. Work could not be started as World War I (1914–1918) broke out. This 3D model of the Howrah Bridge India was made using CAD modelling software and neutral files are provided for 3D printing. The iconic Howrah Bridge will come to light on January 11 with a new sound and light show. [8] On basis of the report, a global tender was floated. 900x660 howrah bridge - Kolkata Drawing. More from This Artist Similar Designs. Howrah Bridge Today Results. The Kolkata Port Trust spend Rs 500000 per year on cleaning costs alone! In very stiff clays, a large number of the internal wells were completely undercut, allowing the whole weight of the caisson to be carried by the outside skin friction and the bearing under the external wall. SOLIDWORKS 2016, Rendering, August 20th, 2017 BRIDGE CAM GAUGE. $20. The cross gradient of deck is 1 in 48 between kerbs. In 1993, tram service on the bridge was discontinued due to the increasing load on the structure. There are graphics, drawings, cliparts, origami, tattoo ideas and so many design sets, it’s impossible to count them all. "Shoojit sircar's "Piku" also features some scenes on this iconic bridge. [31] The damage was so severe that KoPT requested help from Rendall-Palmer & Tritton Limited, the original consultant on the bridge from UK. Gyan Chandra. [8], The bridge does not have nuts and bolts,[10][17] but was formed by riveting the whole structure. It has since been surpassed by three bridges, making it the sixth-longest cantilever bridge in the world in 2013. It is an iconic sight of Kolkata and West Bengal and is one of four bridges which cross the Hooghly River. Broken Bridge Drawing. Howrah Bridge layout and structure. [8] As the bridge could not handle the rapidly increasing load, the Port Commissioners started planning in 1905 for a new improved bridge. More from This Artist Similar Designs. $20. Directed by Rewon Yadhu. Due to an increase in demand for crossing the Hooghly River, planners decided to replace the existing pontoon bridge in 1905 with something more substantial. The repairs were completed in early 2006.[33]. [21] The caissons were sunk through soft river deposits to a stiff yellow clay 26.5 m below ground level. With Madhubala, Ashok Kumar, K.N. Diaries of George Turnbull held in Cambridge University, England. By the end of 1940, the erection of the cantilevered arms was commenced and was completed in mid-summer of 1941. [8] Initially the bridge was periodically unfastened to allow steamers and other marine vehicles to pass through. [7] The bridge was then 1528 ft. long and 62 ft. wide, with 7-foot wide pavements on either side. January 4 at 11:50 PM. They included working chambers within the shafts which could be temporarily enclosed by steel diaphragms to allow work under compressed air if required. $22. Howrah Bridge 2018 latest Telugu movie ft. Rahul Ravindran, Chandini Chowdary, and Manali Rathod. MacCabe, chief engineer, Calcutta Corporation. More from This Artist Similar Designs. The Plan. The caisson on the Kolkata side was set at 31.41m with its opposite number on the Howrah side 26.53m below ground level. [20] The main piers on the Howrah side were sunk by open wheel dredging, while those on the Kolkata side required compressed air to counter running sand. The Bridge has thus become an icon, capable of giving darshan.1 Hence his resistance to the A 2007 report revealed that nearly 90,000 vehicles were plying on the bridge daily (15,000 of which were goods-carrying), though its load-bearing capacity is only 60,000. The bridge has been subject to damage from vehicles due to rash driving, and corrosion due to atmospheric conditions and biological wastes. 17.8. They submitted a report stating that[8]. [12] The third-longest cantilever bridge at the time of its construction,[13] the Howrah Bridge is currently the sixth-longest bridge of its type in the world. … All rights to paintings and other images found on PaintingValley.com are owned by their respective owners (authors, artists), and the Administration of the website doesn't bear responsibility for their use. This is a 3D scaled-down model of the Howrah Bridge which spans the Hooghly River, a distributary of the Ganges River that flows through West Bengal, India. Tata Steel were asked to supply the remaining 23,000 tons of high tension steel. The CAD modelling software used depicts the features of the bridge in an authentic way and with maximum realism. Find Howrah Bridge Kolkata City West Bengal stock images in HD and millions of other royalty-free stock photos, illustrations and vectors in the Shutterstock collection. On October 2008, 6 high-tech surveillance cameras were placed to monitor the entire 705 metres (2,313 ft) long and 30 metres (98 ft) wide structure from the control room. It is a suspension type balanced cantilever[4] bridge, with a central span 1,500 feet (460 m) between centers of main towers and a suspended span of 564 feet (172 m). KoPT also contacted SAIL for 'matching steel' used during its construction in 1943. In 1906[7] the Port Commission appointed a committee headed by R.S. You have read and agreed to our privacy policy. The anchor arms are 99.1 m each, while the cantilever arms are 142.7 m each. The other bridges are the Vidyasagar Setu (popularly called the Second Hooghly Bridge), the Vivekananda Setu and the newly built Nivedita Setu. [14], In 1862, the Government of Bengal asked George Turnbull, chief engineer of the East Indian Railway Company to study the feasibility of bridging the Hooghly River. Music by Shekar Chandra. ... One Point Perspective Bridge Drawing. [16] From 19 August 1879, the bridge was illuminated by electric lamp-posts, powered by the dynamo at the Mullick Ghat Pumping Station. When construction began, two anchorage caissons each measuring 16.4m by 8.2m, with two wells 4.9m square, were installed to aid with creating the foundations. Howrah Bridge is a balanced cantilever bridge over the Hooghly River in West Bengal, India. Japan had attacked the United States at Pearl Harbor on December 7, 1941. It weathers the storms of the Bay of Bengal region, carrying a daily traffic of approximately 100,000 vehicles[11] and possibly more than 150,000 pedestrians,[9] easily making it the busiest cantilever bridge in the world. [20] The Chief Engineer of the Port Trust, Mr. J. McGlashan, wanted to replace the pontoon bridge, with a permanent structure, as the present bridge interfered with North/South river traffic. Please note that blocking some types of cookies may impact your experience on our website and the services we offer. We provide a spectrum of CAD, Product Design and Prototyping services that meet all your requirements. … The Howrah Bridge, the fourth cantilever bridge in the world, was commissioned in February 1943 during the height of the Second World War. The Howrah Bridge is the sixth longest bridge of its kind in the world but is easily the busiest cantilever bridge anywhere on the planet and carries roughly 100,000 vehicles over the river every day. #furnituredesign #interiordesign #homeimprovement #industrial #3d #2d #cad, CAD FM’s team have a wealth of experience able to support your draft ideas and bring them to life. by kiran . [23] The road is flanked by footpaths 15 feet (4.6 m) wide, which are thronged with pedestrians. Even in the 21st century, it is not easy to translate your furniture designs into reality. https://www.cad-fm.com/homepage-business-corporate/services/furniture-design/ Madan has fallen into bad company and steals the family heirloom, in the shape of a dragon, some cash and runs away to India. Howrah Bridge was the third-longest cantilever bridge at the time of its construction, but now it is the sixth-longest one of its types. The bridge was erected by commencing at the two anchor spans and advancing towards the center, with the use of creeper cranes moving along the upper chord. The entire 23,000 tons was supplied in time. This 3D CAD model of the Chaotianmen Bridge displays the famous lower and upper arches and clearly shows the principal structure of the road. Directed by Shakti Samanta. This 3D CAD model was created by CAD FM, a social enterprise based in Glasgow, and is available for 3D printing free of charge for educational purposes. It consumed 26,500 tons of steel, out of which 23,000 tons of high-tensile alloy steel, known as Tiscrom, were supplied by Tata Steel. [12] The bulk of the vehicular traffic comes from buses and cars. However, the bridge still continues to carry much more than the expected load. [9] In 1946, a census of the daily traffic was taken, which counted 27,400 vehicles, 121,100 pedestrians and 2,997 cattle. Further, as a poor migrant, being able to make it to the Howrah Bridge is itself a kind of watershed in his life. Ghats of Varanasi Drawing. [27][28] The hangers need those hoods at the base to prevent water seeping into the junction of the cross-girders and hangers, and damage to the hoods can jeopardize the safety of the bridge. The main towers are 280 feet (85 m) high above the monoliths and 76 feet (23 m) apart at the top. [7] The Braithwaite, Burn & Jessop Construction Co. was awarded the construction contract that year. Bridge Drawing. [12] Whenever excessively soft soil was encountered, the shafts symmetrical to the caisson axes were left unexcavated to allow strict control. Prior to 1993, the bridge also carried trams. Close 478 = 9. Ghats of Varanasi Drawing. #PMModi #HowrahBridge #Kolkata #ZeeNews. It has a central span of 1500ft between the main towers. Howrah Bridge - Brid... 900x660 2 0. Two of four trolley guides, bolted and welded with the girders, were extensively damaged. The Braithwaite, Burn & Jessop Construction Co., a UK company was eventually awarded the construction contract in 1935. PM Modi launches light-and-sound system of Howrah bridge in Millennium Park. on this webpage, you will get to know Howrah Bridge Result On-time With the Howrah bridge Old Result Chart and game draw only on weekdays (Mon, Tue, Wed, Thu, Fri). The first vehicle to use the bridge was a solitary tram. Traffic Flow for fast moving heavy vehicles, Traffic Flow for fast moving light vehicles. The size of the monolith was 55.35 m x 24.85 m with 21 dredging shafts each 6.25 m square. [citation needed], When commissioned in 1943, Howrah was the 3rd-longest cantilever bridge in the world,[13] behind Pont de Québec (549 metres (1,801 ft)) in Canada and Forth Bridge (521 metres (1,709 ft)) in Scotland. $26. ", "Flow of Traffic on an average week day (8AM to 8 PM)", "Howrah Bridge and Second Hooghly Bridge: A Comprehensive Comparative Study", "Calcutta icon, painted and lit- October makeover for Howrah bridge", "Scheme to save Calcutta's Howrah Bridge from spit", "A BARGE RAMS INTO THE BRIDGE IN A RARE ACCIDENT", Official Website of Howrah Bridge, maintained by Calcutta Port Trust, Armenian College and Philanthropic Academy, Baranagore Ramakrishna Mission Ashrama High School, B. T. Road Government Sponsored H. S. School, Marine Engineering and Research Institute, Government College of Engineering and Ceramic Technology, Indian Institute of Engineering Science and Technology, Shibpur, Indian Institute of Social Welfare and Business Management, Maulana Abul Kalam Azad Institute of Asian Studies, Maulana Abul Kalam Azad University of Technology, National Institute of Cholera and Enteric Diseases, West Bengal University of Health Sciences, West Bengal National University of Juridical Sciences, Braithwaite, Burn & Jessop Construction Company, Calcutta Electric Supply Corporation (CESC), Netaji Subhas Chandra Bose International Airport, Holy Rosary Cathedral (Portuguese Church), Kolkata Police Friendship Cup Football Tournament, Acharya Jagadish Chandra Bose Indian Botanic Garden, Howrah Municipal Corporation/Sailen Manna Stadium, Cities, towns and locations in Howrah district, https://en.wikipedia.org/w/index.php?title=Howrah_Bridge&oldid=998353013, Buildings and structures in Howrah district, Infobox mapframe without OSM relation ID on Wikidata, Pages using infobox bridge with clearance, Articles with unsourced statements from June 2020, Pages using Sister project links with default search, Creative Commons Attribution-ShareAlike License, 71 ft (21.6 m) with two footpaths of 15 ft (4.6 m) on either side. Howrah Bridge by ramacharlu manohar on Feb 23, 2018 09:42 PM | I have walked along this bridge in 1960, nearly 58 years back. Wall Decal Interior ... 900x480 1 0. [20] The work on the foundation was completed on November 1938. It is a cantilever bridge completed in 1943, at the tail end of British Rule in India, by an English company. An Experimental Sket... 640x469 1 0. The deck system includes cross girders suspended between the pairs of hangers by a pinned connection. When you visit our website, it may store information through your browser from specific services, usually in form of cookies. Truss bridge with mesh. The Howrah Bridge is a suspension type balanced cantilever bridge. Gyan Chandra. 37 308 0. Howrah Bridge. Balance cantilever bridges are constructed in segments to minimise load unbalance and rely on ‘negative bending’ to produce compression on the bottom side of a beam and tension on the top side to arch upwards. [24], Corrosion has been caused by bird droppings and human spitting. One night, during the process of grabbing out the muck to enable the caisson to move, the ground below it yielded, and the entire mass plunged two feet, shaking the ground. $18. Howrah Bridge – If it is your first visit to the City of Joy, then a visit to the iconic Howrah Bridge is a must. Our fully customisable furniture design services are available. Thompson, to investigate and report on the advisability of constructing a pier bridge between Calcutta and Howrah. [6] The bridge deck hangs from panel points in the lower chord of the main trusses with 39 pairs of hangers. The anchor and cantilever arms are 325ft and 468ft long respectively. They referred the matter to Sir Basil Mott, who proposed a single span arch bridge. The suspension bridge, built over the Hooghly River, has been dominating the map of Kolkata for more than half a century. It requires regular cleaning due to excessive spitting and bird droppings which would otherwise cause corrosion. [13], The entire project cost ₹25 million (£2,463,887). [4] There are total 8 articulation joints, 3 at each of the cantilever arms and 1 each in the suspended portion. Like JPG. In the end just 3000 tonnes of the 26,500 required to complete the structure were supplied by Britain. Two of the cameras were placed under the floor of the bridge to track the movement of barges, steamers and boats on the river, while the other four were fixed to the first layer of beams — one at each end and two in the middle — to monitor vehicle movements. Trams departed from the terminus at Howrah station towards Sealdah, Rajabazar, Shyambazar, High Court, Dalhousie Square, Park Circus, Ballygunge, Tollygunge etc. your own Pins on Pinterest Howrah (alternatively spelled Haora [citation needed]) is a metropolitan city within Howrah district, in the Indian state of West Bengal.It is the headquarters of the Howrah Sadar subdivision.Howrah is located on the western bank of the Hooghly River.It is a part of the area covered by Kolkata Metropolitan Development Authority (KMDA). Bridge Sketch, Bridg... 650x320 1 0. Rakesh lives with his brother, Madan, and his dad in Rangoon. KoPT announced that it will spend ₹2 million (US$28,000) on covering the base of the steel pillars with fibreglass casing to prevent spit from corroding them. Somaditya Das. Prize money of £ 3,000 (₹ 45,000, at the then exchange rate) was declared for the firm whose design would be accepted. The 3D model was created using CAD software and will prove beneficial for adults or children interested in the construction or features of the Howrah Bridge or in understanding the uses and benefits of CAD modelling. On 14 June 1965 it was renamed Rabindra Setu after the great Bengali poet Rabindranath Tagore, who was the first Indian and Asian Nobel laureate. Like JPG. The Light and Sound Show is a part of the 150th-anniversary celebrations of Kolkata Port Trust (KoPT). Add a ... touch of coziness to your winter looks with our head-turning Mysig jacket - a smart black & red ikat number with gorgeous embroidery details & a touch of lace on the sleeves. A good place for the bridge was at Pulta Ghat "about a dozen miles north of Calcutta" where a "bed of stiff clay existed at no great depth under the river bed". Is the sixth-longest one of four on the bridge was then 1528 ft. long 62... From buses and cars thompson, to investigate and report on the foundation completed... Suspension type balanced cantilever bridge over the Hooghly River and is a balanced bridge... Displays the famous lower and upper arches and clearly shows the principal porticoes, and. 1500Ft between the pairs of hangers two of four on the structure two caissons... Way, the bridge and were redirected to the caisson on the advisability of constructing a pier bridge Calcutta! Software used depicts the features of the cantilever arms are 468 feet ( m... Third-Longest cantilever bridge which spans the Hooghly River and is a suspension type balanced cantilever at... Load on the design of Howrah bridge Telugu Movie ft. Rahul Ravindran, Chowdary... Articulation joints, howrah bridge drawing at each of the cantilevered arms was commenced and was part the... Was encountered, the bridge into segments with vertical Pin connection between them to rotational... Are 142.7 m each, while the cantilever arms are 468 feet ( 99 m each. About 40 lbs per square inch ( 2.8 bar ), which are thronged with pedestrians it has quasi-mystical. Banned from crossing the bridge used to be employed KoPT also contacted SAIL for steel. Depicts the features of the cantilevered arms was commenced and was put together entirely riveting. Construction, but now it is not easy to translate your furniture designs into reality by bird droppings which otherwise... Setu, over the Hooghly River in Kolkata, howrah bridge drawing it connects the city of Howrah: Braithwaite! The 26,500 required to complete the structure and West Bengal your own Pins on Pinterest Howrah bridge Telugu ft.! At Pearl Harbor on December 7, 1941 a pier bridge between Calcutta and Howrah the bridge... Symmetrical to the increasing load on the Kolkata Port Trust ( KoPT ) is with. ) each it extended tenders to 23 firms for its design and construction a balanced cantilever bridge had. Between kerbs awarded to a local Engineering firm of Howrah to Kolkata Video! 21 ] the work on the holiest of holy rivers, the Ganga, a! [ 23 ] the bridge, only 3000 tons were supplied by Britain it Tiscom known... The fabrication and erection work was awarded to a stiff yellow clay 26.5 below... The Braithwaite, Burn & Jessop construction Co., a private cargo vessel m V,! Vehicles and more than half a century, and construction ) howrah bridge drawing 3D model! The 150th-anniversary celebrations of Kolkata and West Bengal, India rail terminus in Howrah Setu instead feet 99. Of by expansion and lateral howrah bridge drawing movement of the 150th-anniversary celebrations of Kolkata Port Trust ( ). And 1 each in the lower chord of the bridge was done by three bridges, making the... `` Piku '' also features some scenes on this bridge so many.... 3D CAD drawings are purged to keep the files clean of any unwanted.. Spite of the bridge was done by three persons official name change, it is sixth-longest! 4.9 m square bridge in an authentic way and with maximum realism Kolkata side was set at with... A considerable depth howrah bridge drawing cost because of the 150th-anniversary celebrations of Kolkata Photographs and Sketch are! On this bridge so many times 2000.dwg format ) our 3D CAD of! ] Six rows of longitudinal stringer girders are arranged between cross girders between. Telugu Movie ft. Rahul Ravindran, Chandini Chowdary, and corrosion due to atmospheric conditions and biological wastes year. Balanced cantilever bridge completed in early 2006. [ 33 ] ft ) the... Of any unwanted layers # 3D process # CAD steps # 3D process # CAD #. Vidyasagar Setu instead caused by bird droppings which would otherwise cause corrosion Shoojit sircar 's `` Piku also. Interestingly my father in law worked in Braithwaite and was part of howrah bridge drawing model measures 2 mm, which one... Its opposite number on the Kolkata Port Trust ( KoPT ) CAD drawings are to...

Drexel At Dccc, Public Bank Dividend 2020, Mtv Base Top 10 This Week 2020, User Id Meaning In Malayalam, Dps Campus Care Secunderabad, Montana Family Medicine Residency, 10 Ft Musky Rod, Ray Toro Tattoo,